top of page
701 Dexter
Demolition of a 6-story commercial building in Seattle.
Demolition of a 6-story commercial building located in close proximity to a new condominium complex on one side and active roadways on the three other sides.
Equipment Utilized: Volvo 480 Hi-Reach Excavator w/90’ Boom, Volvo 480 Excavator, Volvo 350 Excavator, Link-Belt 4040 Excavator.
Statistics: Recycled approx. 11,780 tons of concrete, 185 tons of asphalt, and 150 tons of steel; Approx. 97% of generated debris was diverted from landfill.
Owner / Operator: Alexandria Real Estate – Seattle No. 33, LLC.
bottom of page