Haggett Hall Demolition

Structural demolition and hazardous materials abatement of Haggett Hall on the active University of Washington campus in Seattle.

Project Approach: Controlled, floor-by-floor demolition near student housing, academic facilities, and pedestrian routes, with careful debris handling and environmental controls.


Abatement: Precast concrete façade panels containing asbestos mastic were individually rigged and removed by crane, then processed at ground level using our specialized water jet abatement system.


Equipment Utilized: Brokk demolition robot, excavators, crane, and water jet abatement system.


Owner / Operator: University of Washington


General Contractor: Andersen Construction