top of page

Seattle Times Demolition

Demolition of a four 4-story commercial building in the South Lake Union area of Seattle.

Demolition and removal of a 4-story 316,000 SF commercial building that encompassed an entire City block of the South Lake Union area of Seattle. Work included the separation, bracing, shoring, and protection of the historic façade on three sides of the structure. Additionally, the project involved the removal of a significant amount hazardous materials.  

 

Equipment Utilized: Komatsu 300 Hi-Reach Excavator w/70’ Boom, Komatsu 400 Excavator, Volvo 480 Excavator, Volvo 380 Excavator.

 

Statistics: Approx. 27,000 tons of concrete recycled and 375 tons of steel.


Owner / Operator: Onni Group.


 

 